BROOKLYN COMMUNITY BOARD 6
LANDMARKS/LAND USE & HOUSING COMMITTEE
December 5, 2024
Attendees:
David Briggs - Chair
Jerry Armer
Daniel Kummer
Catherine Vaughn
Quorum not present.
Landmarks
43 Sterling Place (Park Slope Historic District Extension II) - Legalize replacing
bluestone with tinted concrete sidewalk without LPC permits
Presentation made by the owner. She received a notice from her insurance carrier that
her existing bluestone sidewalk must be repaired since it presented a tripping hazard.
She hired a contractor and contacted the DOT who issued a permit. She misunderstood
that she was also supposed to get LPC approval.
Questions/Comments from committee:
1. Did DOT indicate that she needed an LPC permit? They did not.
2. She confirmed with photos that the sidewalk at 41 Sterling is bluestone and the
sidewalk at 45 Sterling is untinted concrete.
Jerry - recommended approval
Daniel - seconded
Recommendation passed 4-0. A formal motion will be made at the December 11 board
meeting.
Land Use
DEP presentation: Construction Update for the Combined Sewer Overflow at the Head
End Site Facility (north end of the canal). There have been some complaints regarding
odors during the excavation of the 200’ deep cut off wall around the perimeter of the
tanks. Approx. 50% of the complaints have been from the same caller. In order to
reduce the impact of the odors, DEP presented an accelerated remediation timeline and
other strategies, including capping the excavations with foam and trapping the odors in
a vent, similar to CO2 scrubbers. The accelerated timeline targets March 2025 for
completion of excavation.
The committee and community asked several questions.
- Why was EPA pushing back on the accelerated schedule?
- Have any harmful vapors/compounds been identified in the air monitoring? DEP
indicated that EPA should answer this question.
- Where can the results of the monitoring be found? DEP will provide.
- Who should people contact if they have immediate concerns? DEP will provide.
- Is the overall project on schedule? The project is currently a few months behind
schedule, but the accelerated timeline will help close the gap.
Daniel - Motion to support accelerated timeline and committee encourages DEP to
continue pursuing strategies for reducing odors. Request to continue updating the
community on progress and providing all relevant data to the public.
Jerry - seconded
Recommendation passed 4-0.
A formal motion will be made at the December 11 board meeting.
The next day DEP provided the following information regarding the monitoring and
contact info for the construction liaison:
https://www.nyc.gov/site/dep/water/gowanus-canal.page
Use the dropdown tab for “Superfund.” The air monitoring reports include a summary,
which is helpful. Right now, the air sampling data is a spreadsheet (this is what EPA
directed us to post), but we are thinking about how to make that more understandable.
Community Construction Liaison
Valentina Mascaro
gowanusccl@johnson-asberry.com
934-216-0209
End of meeting.